Supply of 18 Drinking Water Treatment Plants (2E3000) for the Ministry of Energy and Hydraulic Resources Training
Adaptation of the Vegas del Condado Fish Farm
Project Status:
Executed
Country:
Spain
Completion Date:
2007
Industry:
Water
Adaptation Vegas del Condado fish farm in León.
This project belongs to Water
Related projects
Construction work on the wastewater treatment plant and pumping station for the KEUR MASSAR-IVOUANE PEULH repopulation area. The jobs consisted ...
Supply of 8 Mobile Drinking Water Treatment Plants (2E3000) Installation of 1 Solar Water Treatment (SWT) Plant with floating intake Transmissi ...
Execution and improvement of the collector pipes and the construction of a wastewater treatment plant
Upgrading of the electromechanical facilities at the pumping plant for the Caspe Channel
Construction of a 1.7 MWp photovoltaic solar power station in Spain
Construction works on an senior citizen living and daycare facility in Villafranca de los Caballeros
Construction of a 3.5 MWp photovoltaic solar power station in Spain