Haiti

English

St. Louis du Nord Community Hospital

Project Status: 
Completion Date: 
2011
Industry: 
Type: 
Description: 
Design, construction and supply of a 720 square meter health center of 20 beds to help the areas of most need in North Haiti under the activities in response to the earthquake of January 2010. Project developed with Hilfswerk NGO and financed with public Austrian funds.

Medical Equipment Hospital Gonaives

Project Status: 
Completion Date: 
2015
Industry: 
Type: 
Description: 
The project is to provide and operate departmental equipment Hospital of Gonaives, Artibonite Haiti funded by the Government of Canada through Cooperation Agency [CIDA), where the United Nations Office for Project Services has been IUNOPS contracted to acquire such Hospital and Medical on behalf of the Ministry of Health of Haiti, and being in turn, International Business and Trade, LLC one of the leading suppliers of equipment and services related.

Hospital Simbi Continental

Project Status: 
Completion Date: 
2016
Industry: 
Type: 
Description: 
The structure is entirely made ​​of reinforced concrete, with a system of light frames and slabs. Have a level and a construction area of about 3460 m². The hospital has two generators, one for general use 600 kW and a backup for critical areas 45kW located in a platform on the west side of the building. It also has a rainwater tank with a capacity of about 50.000 gallons in the courtyard and an area of ​​recycling and waste management at the east end of the site.

Lycée Touissant Louverture

Project Status: 
Completion Date: 
2015
Industry: 
Type: 
Description: 
This project includes the design and construction of a building for the secondary section, including 24 classrooms, library, computer room, administrative offices. The primary section includes 16 classrooms, library, administrative offices, sanitary facilities, etc. Includes also the construction of a building for laboratories, construction of a cafeteria, auditorium and a multi-field games. Identical reconstruction of the building of the Friendly Lycée Toussant Louverture First phase executed: 2015 Second phase: 2016 Under Development

Lycée Alexandre Petion

Project Status: 
Completion Date: 
2016
Industry: 
Type: 
Description: 

This project includes the design and construction of a building for the secondary section, including 21 classrooms, library, computer room, administrative offices. The primary section includes 16 classrooms, library, administrative offices, sanitary facilities, etc. Includes also the construction of a building for laboratories, construction of a cafeteria, auditorium and a multi-field games. Identical reconstruction of the building of the Friendly Lycée Alexandre Petion.

First phase executed: 2015

Subscribe to RSS - Haiti