Execution of a bypass in the municipal district of La Albuera (Badajoz) on the N-432 road from Badajoz to Granada, also enabling connections with the ...
Duero Channel
Related projects
Construction of a public building designed into six floor levels above ground divided into the following general sections: Lobby and Auditorium ...
This project will consist of a hangar totaling 30 meters in height and 6,400 meters of open-bay floor space, making it possible for maintenance t ...
Rehabilitation and expansion of National Highway RN1, in the following batches: Batch 1, straightening of ascending roads KP12 to KP32, including culv ...
Construction of a 9.5 MWp photovoltaic solar power station in Spain
Construction of a 1 MWp photovoltaic solar power station in Spain
Construction of a 11.38 MWp photovoltaic solar power station in Spain
This project will consist of a hangar totaling 30 meters in height and 6,400 meters of open-bay floor space, making it possible for maintenance t ...