Execution and improvement of the collector pipes and the construction of a wastewater treatment plant
Electro-mechanical Pumping Facilities for the Caspe Channel
Project Status:
Executed
Country:
Spain
Completion Date:
2008
Industry:
Water
Upgrading of the electromechanical facilities at the pumping plant for the Caspe Channel
This project belongs to Water
Related projects
Supply of 8 Mobile Drinking Water Treatment Plants (2E3000) Installation of 1 Solar Water Treatment (SWT) Plant with floating intake Transmissi ...
Adaptación de la piscifactoría de Vegas del Condado, en León.
Repair work on the Orellana channel in Section A between KP 0.200 and 2.600 in the municipal district of Orellana la Vieja
Remodeling of the Santa Ana Pre-school (ages 0-3) Center in Tudela
Description: Construction of a 1.1 MWp photovoltaic solar power station in Spain
Works on municipal logistics center in San Sebastián de los Reyes
Construction of a 2.6 MWp photovoltaic solar power station in Spain