IENE Project

  • Proyecto IENE
Project Status: 
Executed
Country: 
Brazil
Completion Date: 
2010
Industry: 
Energy
EPC LT 500 kV Colinas-Ribeiro Gonçalves and LT 500 kV Ribeiro Gonçalves-Sao Joao Piauí with a total length of 710 km. Colinas 500 kV, Ribeiro Gonçalves 500 kV and Sao Joao Piauí 500 kV associated substations.