INTEGRAL WATER POTABILIZATION AND SUPPLY SYSTEM, CUNENE PROVINCE

Project Status: 
Executed
Country: 
Angola
Completion Date: 
2013
Industry: 
Water

Construction of a WTP in the province of Cunene for processing Cunene River water into drinking water and distributing it among the towns of Xangongo and Ondjiva by means of a pipeline of approximately 100 km between the reservoirs which were built and the pumping stations for serving all of this region’s inhabitants.

Drinkable water 16,300m3 / day

  • Functions : filtration , decantation, sludge drying Water storage 5,000m3 / day
  • Pumping and abduction = > Xangongo -Môngua (43km ) - Ondjiva (57km )
  • Surface concrete tanks with a storage capacity of water 24,000m3 / day
  • 98 km of pipes and connections to local networks Supply of drinking water to 250,000 people