Construction of a WTP in the province of Cunene for processing Cunene River water into drinking water and distributing it among the towns of Xangongo and Ondjiva by means of a pipeline of approximately 100 km between the reservoirs which were built and the pumping stations for serving all of this region’s inhabitants.
Drinkable water 16,300m3 / day
- Functions : filtration , decantation, sludge drying Water storage 5,000m3 / day
- Pumping and abduction = > Xangongo -Môngua (43km ) - Ondjiva (57km )
- Surface concrete tanks with a storage capacity of water 24,000m3 / day
- 98 km of pipes and connections to local networks Supply of drinking water to 250,000 people