Rehabilitation of the local road of 52 km between the towns of Quilca and El Alto in Camaná (Arequipa).
La Albuera Bypass
Related projects
Execution of the construction of the bridges located along the Tômbua / Namibe / Bentiaba / Lucira axis in the region of Namibe, Angola, bridges wit ...
Overall rehabilitation, eliminating barriers and preventing hazards at the Arboleda Special Education School in Teruel
This project will consist of a hangar totaling 30 meters in height and 6,400 meters of open-bay floor space, making it possible for maintenance t ...
Reinforcement of the west and north approaches to the La Serena Dam on road EX103 (Castuera and Esparragosa de las Lares).
Environmental restoration of the current ecosystems in the Zújar River area, along the stretch from Ermita de Santa María del Zújar and Vado de Ent ...
Construction of a 11.38 MWp photovoltaic solar power station in Spain
Rehabilitation of the former slaughterhouse for use as a multi-functional cultural center.