Supply of Class I all-in-one means (fire trucks) and Class II all-in-one means (traffic accident response means) for the civil defense and fire depart ...
Pesquería Fish Farm - Quintanar de la Sierra
Project Status:
Executed
Country:
Spain
Completion Date:
2007
Industry:
Water
Adaptación de la piscifactoría de Vegas del Condado, en León.
This project belongs to Water
Related projects
The objective of this project is to implement a logistics system of rapid response to emergencies caused mostly by natural disasters. Through storages ...
Adaptation Vegas del Condado fish farm in León.
Changeover to sprinkler watering for the Piracés Irrigation Farming Community in Huesca
This project will consist of a hangar totaling 30 meters in height and 6,400 meters of open-bay floor space, making it possible for maintenance t ...
Construction of a pedestrian bridge over the Avenida de la Paz (M-30) highway connecting Ramón de Aguinaga St. (west side of bridge) to San Marcelo ...
Construction of a 8 MWp photovoltaic solar power station in Spain
Description: Construction of a 1.1 MWp photovoltaic solar power station in Spain