REHABILITATION OF PROJECT JEBBA DAM, RIVER NIGER

Project Status: 
Executed
Country: 
Nigeria
Industry: 
Energy

Rehabilitation of Jebba Spillway discharge channel and the grouting of auxiliary dam No. 3 at Jebba Hydro Power Station:

  • Strengthening of the walls of the main and secondary spillway
  • Ancillary works (Hydraulic equipment, leak control, parking, VRD)