Construction work on the wastewater treatment plant and pumping station for the KEUR MASSAR-IVOUANE PEULH repopulation area. The jobs consisted ...
Supply of Class I all-in-one means (fire trucks) and Class II all-in-one means (traffic accident response means) for the civil defense and fire departments /MINISTRY OF THE INTERIOR
Related projects
Supply of 18 Drinking Water Treatment Plants (2E3000) for the Ministry of Energy and Hydraulic Resources Training
Execution and improvement of the collector pipes and the construction of a wastewater treatment plant
Adaptación de la piscifactoría de Vegas del Condado, en León.
Execution of the construction of the bridges located along the Tômbua / Namibe / Bentiaba / Lucira axis in the region of Namibe, Angola, bridges wit ...
Supply of Class I all-in-one means (fire trucks) and Class II all-in-one means (traffic accident response means) for the civil defense and fire depart ...
Rehabilitation and redesign of peripheral roads in the city of Luanda; Connection Auto Estrada - University Campus - Sapu - Estrada do Golfe; Co ...
EPC 400 kV and 220kV Transmission Lines with a total length of 300 km. Lucala, Capanda and Viana 400/220 kV substations.