Construction work on the wastewater treatment plant and pumping station for the KEUR MASSAR-IVOUANE PEULH repopulation area.
- The jobs consisted of the construction of 2 kilometers of Drinking Water Lines (160 mm diameter) and two other wastewater lines (diameter 250 mm).
- The medium-voltage line was also built, at 2.5 km, the pumping station (2,520 m3/d) and the wastewater treatment plant (2,520m3/d).